PROJECT OVERVIEW

Design and construction of a 10,402 square foot office and production facility plus adjacent site work. The building is a two story building with Butler Pre-engineered super structure with light weight concrete mezzanine and exterior skin of stucco and split block masonry wainscot including high efficiency ribbon window system and roll up doors. EKC was responsible for providing all design, engineering and construction services. We coordinated design with our architect and constructed the facility in 7 months. We provided the structure plus all site work, landscaping, curbs, gutters, sidewalk and parking in a turn key manner.

Project Dates: Start 07/2014 – Completion 02/2015

CLIENT TESTIMONIAL

My multiple experiences working with EKC have been excellent. They have proven to very professional and have brought exceptional construction knowledge and excellent management to their projects. Anyone would be well served in choosing EKC as general contractor for their upcoming project.

CAMPBELL COMPANYPhil Tate, CEO

PROJECT DETAILS

Categories:
Client: Campbell Company
Location: 450 McGregor Street, Boise, ID
Surface Area: 10,402 SF
Completed: 2015
Architect: Megan Burke - Erstad Architects