Interior and exterior remodel to an existing 81,264 square foot, six story, hotel building; Demolition work on the 1st story included remove existing exterior sidewalk canopy and extend detached steel canopy with barrel framed extension. Renovate lobby/reception areas and guest room finishes, update the level of accessibility to (6) standard accessible rooms and (2) roll-in shower rooms; install new floor and wall finishes, replaced existing lighting fixtures, new plumbing, fire sprinklers and electrical work.
Project Dates: Start 10/2012 – Completion 9/2013